| 132kV Compound Equipment and Structure Level Plan | |
| 4m Acoustic Fencing Plan and Elevations | |
| Access Plan | |
| Acoustic Fencing and Gate Plan and Elevations | |
| Alternative Site Assessment | |
| Auxiliary Transformer Plan and Elevations | |
| Bat Survey Report | |
| Battery Container Plan and Elevations | |
| BESS Compound Equipment Levels Plan | |
| Biodiversity Enhancement Feasibility Assessment | |
| CCTV and Lighting Columns Plan and Elevations | |
| Contextual Elevations (1 of 8) | |
| Contextual Elevations (2 of 8) | |
| Contextual Elevations (3 of 8) | |
| Contextual Elevations (4 of 8) | |
| Contextual Elevations (5 of 8) | |
| Contextual Elevations (6 of 8) | |
| Contextual Elevations (7 of 8) | |
| Contextual Elevations (8 of 8) | |
| Detailed Fire Safety Plan | |
| Detailed Site Plan | |
| Drainage Impact Assessment | |
| ECU Covering Letter | |
| Emergency Access Gate Plan and Elevations | |
| Environmental Noise Impact Asessement (Part 1 of 4) | |
| Environmental Noise Impact Asessement (Part 2 of 4) | |
| Environmental Noise Impact Asessement (Part 3 of 4) | |
| Environmental Noise Impact Asessement (Part 4 of 4) | |
| Fire Safety Plan | |
| Fire Water Tank Plan and Elevations | |
| Flood Risk Assessment | |
| Fyrish Visualisations | |
| Geoenvironmental and Geotechnical Desk Study (Part 1 of 2) | |
| Geoenvironmental and Geotechnical Desk Study (Part 2 of 2) | |
| High Voltage Transformer Plan and Elevations | |
| Historic Environment Desk Based Assessment (Part 1 of 2) | |
| Historic Environment Desk Based Assessment (Part 2 of 2) | |
| Hydrogeological Assessment Report | |
| Land Capability for Agriculture Report | |
| Landscape and Visual Appraisal | |
| Landscape and Visual Appraisal Fig 1 2 | |
| Landscape and Visual Appraisal Fig 3 5 | |
| Landscape Plan | |
| Location Plan | |
| LV Cabinet Plan and Elevations | |
| Outline Battery Safety Management Plan | |
| Planning Design and Access Statement | |
| Pre Application Consultation Report | |
| Preliminary Ecological Appraisal (Part 1 of 2) | |
| Preliminary Ecological Appraisal (Part 2 of 2) | |
| Protected Species Survey Report | |
| Site Finish Levels Plan | |
| Site Layout Plan | |
| Standby Generator Plan and Elevations | |
| Substation Building Plan and Elevations | |
| Substation Building Plan and Elevations | |
| Transformer Plan and Elevations | |
| Transformer Plan and Elevations | |
| Transport Statement & Construction Traffic Management Plan | |
| Tree Survey | |
| Typical Fencing Plan and Elevations | |
| Typical Fencing Plan and Elevations | |